-
Dam safety inspection
2020-04-13
The purpose of the dam safety inspection was to monitor the safety of a stone masonry overflow dam (12m high and 161m long) using the ZZ Universal resistivity meter. -
Mineralisation exploration
2020-04-13
For this survey, several crosshole sections were undertaken in order to deduce the developing direction and size of the underground mineralisation.