ZZ-Resistivity-Imaging-Home
ZZ-Product-Index
ZZ-Application-index
ZZ-FAQ-Index

ZZ-News-Index
ZZ-Contact








ZZ-Copy-right-statement
ZZ-Copy-Privacy-statement

ZZ Resistivity Imaging Pty. Ltd.

FAQ

ZZ-button

System hardware and software

2.5 How to set up a FlashRES system?


Please refer to diagram below.














Setting up a FlashRES system is very simple. Following the simple steps below will ensure that the user can collect accurate data in timely manner:

            Step 1: Put down electrodes and cables

            Step 2: Connect the FlashRES system to the cables, a common ground electrode, a laptop and a   12V battery.

            Step 3: Run electrode check to ensure all electrodes are well connected, poorly connect             electrodes need to be investigated before carry out data collection.

On average, setting up a 189m survey line with two people takes approximately 30-40mins.

  

Connecting resistivity meter with other parts
ZZ-logo